Home › Guides › Understanding Expected Move

Understanding Expected Move

Options expected move: why two calculators can give different answers

One calculator shows a $5 move; another shows $6.23. Before deciding one is wrong, check what each number measures, which prices it uses and when its clock stops.

Published 2026-10-26 · Updated 2026-10-26 by ConvexRadar · Research software, not financial advice.

Prepared with AI assistance and checked against the linked primary sources. Every number below is invented for teaching. The option-price and IV examples are separate inputs, not a fitted market forecast or trading recommendation.

In this guide

Put a label beside each number

An expected-move label can refer to several calculations. Write down the method before comparing the output. The table uses deliberately separate teaching inputs; the 45% IV was not derived from the $2.50 call and put.

In the straddle example, the stock and both strikes are $100. The call and put share an expiration and each has an illustrative midpoint of $2.50. In the separate IV example, the stock is also $100, but the assumed annualized IV is 45% and the horizon is seven calendar days.

Invented examples: separate inputs, different meanings
MethodResult and units
ATM straddle quote$5.00 quoted premium per share
IV-based range±$6.23 in the stock price over seven calendar days
tastylive event rule±$4.25 in the stock price under that event convention

The $5, $6.23 and $4.25 figures are not three valuations of the same measured market. The sections below explain the different definitions.

A $5 straddle quote is not a $5 contract bill

Fidelity’s straddle explanation pairs one call with one put on the same underlying, strike and expiration. ATM means at the money: the strike is at or near the stock price. Adding their premiums gives the quoted price of the pair.

In our example, $2.50 + $2.50 = $5 per share. With a 100 premium multiplier on each leg, one call costs $250 and one put costs $250 at those prices: $500 for the pair before charges. OCC’s equity-option specifications describe standard contract units and adjusted contracts; check the actual terms.

These are midpoints, not fills. The option mark-price versus exit-price guide explains that distinction. If both legs were actually bought for a combined $5 per share and held to expiration, the simplified breakevens would be $95 and $105: the $100 strike minus or plus the paid premium, excluding charges.

Those endpoints belong to the expiration payoff calculation. They are not a probability interval, and they do not establish what selling the position before expiration would return.

The IV formula starts with a different input

Schwab’s IV explanation illustrates a common approximation: stock price × annualized IV × the square root of the fraction of a year. Using our independent assumptions gives $100 × 0.45 × √(7/365) ≈ $6.23. Centering that amount on $100 gives approximately $93.77 to $106.23 at the stated horizon.

The 45% is an annualized volatility input, not a seven-day percentage. The square-root term rescales it. This is a simplified one-standard-deviation estimate under the model’s assumptions; it does not promise that 68% of real outcomes will land inside the band or that price will stay inside it throughout the week.

IV itself is inferred from option prices through a model. OIC’s technical explanation also describes how IV can differ across strikes and expirations. A single-contract IV, an ATM reading and a provider’s combined reading need not match.

Keep the time basis and event horizon consistent

The seven-day example counts calendar days and divides by 365. Schwab’s earnings discussion also shows a daily calculation based on trading days. Use the day count and annualization convention specified by the provider; changing the denominator while keeping incompatible inputs does not reconcile two methods.

An expiration a week after earnings includes time before and after the announcement. Its options price more than the earnings reaction alone. Schwab separately describes Market Maker Move as a proprietary estimate for an upcoming event. A full-expiration calculation is not automatically an isolated one-day earnings estimate.

After the announcement, stock price, time remaining and IV may all change. The IV-crush guide explains why a favorable stock move can coexist with a lower option price. Expected move describes the underlying’s movement; delta describes an option’s local sensitivity to a stock move.

Treat the 85% rule as a named convention

tastylive’s event calculation uses 85% of a front-month ATM straddle near a binary event, describing use the day before the event or very close to expiration. Applied to our invented $5 straddle, its arithmetic gives $4.25.

That explains why a provider might display a smaller number than the full straddle price. It is a provider-specific event convention, not a universal correction to every straddle or IV formula. Multiplying by 85% does not change the actual premium paid or the expiration breakevens of a purchased straddle.

Reconcile two calculators in five checks

Record these details beside each result. The first mismatch often explains more than another decimal place:

  1. Method and units: is the output a full straddle premium, a scaled event convention or an IV-based stock-price range? Is it dollars, percent or contract cost?
  2. Contract and horizon: match the underlying, strike and expiration. For earnings, record the announcement time and whether the estimate covers that event alone or the entire remaining life.
  3. Price inputs: use the same observation time and quote convention. A last trade, midpoint and executable bid or ask are different inputs.
  4. IV and clock: identify the contract or aggregation behind the IV, confirm it is annualized, and match calendar or trading time to that model.
  5. Purpose: keep a range estimate separate from a position’s actual cost, expiration payoff and possible exit price. None is a trade recommendation.

Use the scanner to organize the contract research

ConvexRadar’s option-chain scanner helps organize exact contracts and their research context. Use it to identify the call or put, strike and expiration, then verify a current quote and data timestamp with your broker or data source.

ConvexRadar does not currently compute expected move. Its displayed Stored IV is a capped legacy value from the stored scan, not an uncapped annualized IV input for this formula. Do not substitute it into the calculation or treat it as historical IV rank.

The useful outcome is a comparison you can explain: the method, inputs, time horizon and units behind each number.

Frequently asked questions

Should the straddle and IV calculations give the same answer?

No. They use different definitions and can use different inputs. A quoted straddle premium is not the same quantity as a model-based one-standard-deviation move. Compare the method, time horizon and input sources first.

Does a $6.23 expected move mean my option gains $6.23?

No. This example estimates a move in the stock’s price, not an option’s premium or a position’s profit. Delta, changing IV, time remaining, execution prices and charges affect the option result.

Can I use ConvexRadar’s Stored IV in the formula?

No. The displayed field is a capped legacy scan value. Obtain an uncapped annualized IV input with a documented model, contract or aggregation, time convention and timestamp. ConvexRadar does not currently calculate expected move.

Start with the contract, then check the calculation. Use the chain-scanner workflow to identify the call or put, strike and expiration. Obtain current prices and uncapped annualized IV from a source that explains its model and timestamp.

Trading options involves risk. ConvexRadar is research software and does not provide financial advice or guarantee trade outcomes.